1.
Hameed AA, Al-Zwainy FMS. Diagnose the Variables Affecting the Estimation of Completion Time of Engineering Projects using Intelligence Neural Network Models. JESIT. 2022;6(5):1-24. doi:10.26389/AJSRP.B110622